Medupi Secondary Clarifier Substation Relocation
Client: Wandeme Resources Management
Project: Medupi Secondary Clarifier Substation Relocation
Location: Medupi Power Station, Lephalale, South Africa
Year: 2025
Scope of Work
Control & Instrumentation (C&I) and Electrical Engineering scope for the relocation of the Secondary Clarifier Substation. The objective of the project was to ensure safe, efficient, and compliant transfer of operational infrastructure to a newly constructed substation, minimizing plant downtime and ensuring full integration with existing control systems.
Services Provided
Basic and Detailed Design:
Developed engineering layouts, design calculations, and integration drawings to support the new substation configuration.
Cable Engineering Deliverables:
Cable Schedules (C&I and Electrical)
Termination Schedules (C&I and Electrical)
All documentation aligned with Eskom’s design standards and Medupi project data structures.
Panel Orientation and Aisle Spacing Design:
Cable Racking Layout Design:
Engineered the racking system for C&I and power cabling to ensure separation, ease of maintenance, and compliance with IEC standards
Partnerships
How we differ
- We are a BBBEE Level 1, CIDB 1EP and 1CE.
- Team of dedicated individuals, with in‐depth experience in running successful entities.
- Our planning and execution are made easy by our QMS, that keeps our procedures, policies, and processes in place and auditable always.
- We have established a continuous Improvement Process (CIP) to make sure we keep on getting better at what we do, and this will help us to grow.
What We're About
Toyethu strives to provide complete engineering solutions in power generations. Our core business focuses on Electrical, Control and Instrumentation.
Registration No. 2011/025233/23 – CSD Registration No. MAAA1050374 – Eskom Vendor No. 0011091224